Meeting Minutes
– TWG Meeting October 28, 2005
IDWR Office – Boise, ID
In Attendance –
Gene
Dana, USGS
Leigh Bailey, Payette National Forest
Christa Braun, BLM
Erv Cowley, BLM
Linda Davis, IDWR
Sandra Thiel, IDWR
Genna Ashley, IDWR
Valdon Hancock, Sawtooth NF
The
meeting began at approximately 9:15 a.m.
HUC
REVIEW
Raft River 17040210 – The TWG group reviewed this unit with Valdon
Hancock, Sawtooth National Forest. Due
to network problems, NetMeeting was unavailable for this meeting, but Valdon
worked with the TWG group via telephone connection only.
This huc is shared by Utah, which has certified linework.
It was decided to keep the Utah linework where possible, and change the
Idaho linework minimally to make it more hydrologically correct, per Valdon’s
suggestions. After the changes have
been made by Idaho, they will be sent to Utah for review.
Idaho
has split the Utah 6th field Circle Creek-Raft River into two 6th’s
– Circle Creek-Raft River and Imigrant Canyon-Raft River, in order to keep a
pure 6th (Circle Creek) at 17,200 acres.
At
Valdon’s suggestion, the TWG broke Grape Creek out as a pure 6th
field (see shapefile “TWG20051028.shp”.
Also, Grape Creek should be in the same 5th field as Edwards
Creek, as they come down the same valley, so this 6th field unit will
become part of the Cottonwood Creek 5th field unit.
The
Johnson Creek and George Creek 6th field units should hydrologically
be linked together. The Johnson
Creek 6th field unit will be moved into the George Creek-Raft River 5th
field unit.
Valdon
moved Barnes Creek 6th into the Clear Creek 6th.
The NAIP, and 949 aerial photography shows Barnes Creek and Holt Creek
joining up approximately 6 miles before Raft River.
The
5th field name Sandrock Canyon-Meadow Creek will be renamed to Meadow
Creek
The
5th field name Johnson Creek-Raft River will be renamed Wildcat
Creek-Raft River
The
5th field name George Creek-Raft River will be renamed Edwards
Creek-Raft River
The
Monument Canyon 6th field will be combined with a portion of the
Sandrock Canyon 6th field unit.
For specific line placement, see shapefile “TWG20051028.shp”.
The where these would meet Raft River was cleaned up.
The
TWG re-sectioned portions of the 6th field Sublett Creek into
different 5th and 6th field units.
Upper and Lower Sublett Creek, Warm Creek and Shirley Creek will now
comprise a 5th field. For
specific line placement, see shapefile “TWG20051028.shp”.
The
leftover 6th field portion of the old “Lower Sublett Creek”
(which isn’t actually Sublett Creek) will be grouped into the Junction Creek 5th
field, along with the Calder Creek and Eagle Point 6th field units.
This will create a very large 6th field unit, called Idahohome-Raft
River. A justification will be
written for this area.
Poison
Hollow-Echo Hollow 6th field will be renamed Echo Hollow.
The confluence was cleaned up in this unit.
ACTION
ITEMS:
Genna Ashley will make the changes on the Raft River
hydrologic unit and send the edits to Valdon Hancock for approval.
MISCELLANEOUS
DISCUSSION
Sandra Thiel and Gene Dana talked about the NHD progress. There are only 2 remaining hucs, and they are very close to completion. Sandra also went over some issues that she encountered when processing NHD for the Middle Fork Payette hydrologic unit. The NHD lines need to fall within the new 4th, 5th, and 6th field boundary lines and the watershed linework should be snapped to the NHD at the confluences.
NEXT
SCHEDULED TWG MEETING (S):
Thursday,
November 17, 2005 at the Idaho Department of Water Resources 5th
floor conference room (Arrowrock Rm 549-F) at 9:00 a.m.
For
directions and/or NetMeeting connections, please contact Genna Ashley at (208)
287-4880 genna.ashley@idwr.idaho.gov
***Subject to change before meeting***